Port Augusta Prison

Mossop Constructions

Work that was completed

The Port Augusta Prison works included a refurbishment to 17 cells and construction of 2 new cells in the Greenbush cell block. It involved removal of redundant fixtures and pipework throughout. Once this was done all hot and cold pipework was replaced with new in service ducts including the supply and installation of an Enware water management system. Sanitary fixtures were also replaced in all cells with security specified items. New hot water services were installed in the plant room.

Goodeside’s scope of works

  • Removal of redundant fixtures
  • Cap water and waste pipes for works
  • In-ground drainage alterations to suit new fixtures
  • Supply and install of new stormwater drain and sumps to courtyard
  • New hot and cold pipework through out including new hot water services
  • Supply and installation of Enware water management system
  • Thermostatic mixing valves to service ducts
  • Backflow protection
  • Sanitary fixtures and tapware, including detention specified items
  • Testing and commissioning

Location: Port Augusta, SA